Job Order Wise Raw Material Assigned

Previous pageReturn to chapter overviewNext page

bullet01 This report is used to view the report that displays how much Raw Material assigned for a particular Job Order.

 

bullet01 Job Order Wise Raw Material Assigned: Main Menu > Production > Production Reports/ Queries > Production Raw Material Reports > Job Order Wise Raw Material Assigned

 

bullet01 Before generating the report, a Report Viewer will appear, as shown earlier, where user can select the configuration and can specify the date and other details for the report.

 

bullet01 Press F2 to create the report and below given window is the view of Job Order Wise Raw Material Assigned.

 

bullet01 If user wants print view of report or user have to convert the report in some other format then user can check the Buttons In Report given in the tool bar.

 

JO Wise RM Assigned

 

Fig 1. Job Order Wise Raw Material Assigned

 

Back To Top